Activity: Consultancy and contribution to enterprise › Consultancy
Description
The proposal for this Low Carbon Devon (LCD) climate chamber test facility was to provide a space that could be used to trial different technologies and scenarios in a controlled environment. The brief called for a modular construction, and one that could potentially be disassembled in the future should the facility need relocating to a different location on campus.
I worked as the project lead and architect for this project. As a consultant to the University, I prepared a concept design, building control information, construction details and tender packs for this project. Sadly the tender returns were greater than the budget for this project and it did not continue beyond the tender stage.