The design of a climate chamber for the university

Activity: Consultancy and contribution to enterpriseConsultancy

Description

The proposal for this Low Carbon Devon (LCD) climate chamber test facility was to provide a space that could be used to trial different technologies and scenarios in a controlled environment. The brief called for a modular construction, and one that could potentially be disassembled in the future should the facility need relocating to a different location on campus.

I worked as the project lead and architect for this project. As a consultant to the University, I prepared a concept design, building control information, construction details and tender packs for this project. Sadly the tender returns were greater than the budget for this project and it did not continue beyond the tender stage.
Period9 Sept 202115 Mar 2022
Degree of RecognitionRegional